Назад
INSPECTION OF PERMAFROST SOILS
29 сентября 2021 г.
Target
Obtaining objective information on permafrost condition in the area of an administrative building foundation during maximum seasonal defrosting.
Result
The depth of defrosting in foundation corners is 12-13 m and locally reaches 15-16 m
The average depth of seasonal defrosting outside the surveyed building perimeter is 3-5 m
The pile foundation is fully located in the array of "plastic" frozen soil
Value
Choosing pile depth for resting on frozen soils, based on actual data
Location optimization for buildings and structures